CONSTRUCTION APARTMENTS - FLATS RECONSTRUCTIONS
- Total Rebuild first floor apartment 110 m2 on Mesogion (Year 2011)
(work: purges walls, new plumbing and heating installation with autonomy, new electrical installation, transportation and kitchen creating a new bathroom, changing with new aluminum frame, metal patio construction, tiling throughout, central air conditioning in living room - kitchen - dining room, plasterboard with spotlights and concealed lighting throughout, new kitchen and wardrobes in bedrooms / d, installing new interior doors, colors in all areas. (Running time work: 60 days)
- Renovation apartment 78 m2 in Kaisariani (Year 2011)
- Renovation - construction design apartment 60 m2 Psyrri (Year 2011)
- Renovation - energy upgrade apartment 80 m2 in Corinth (Year 2011)
(work: purges walls, new plumbing, new electrical installation, transportation kitchen and bathroom, changing with new aluminum frames, tiling throughout, issuing energy certificates
- Renovation - energy improvement district in Kiato - Corinth (Year 2011)
(work: changing frames with new energy aluminum fitting solar water heater. issuing energy certificates
- Total Rebuild first floor apartment in Kallipoli Piraeus (Year 2011)
(work: purges walls, new plumbing, new electrical installation, transportation kitchen and bathroom, changing with new aluminum frame, metal loft building, tiling throughout, installation of new internal doors, plasterboard to spot a kitchen and bath supplies and installation of new kitchen and wardrobes in bedrooms / d colors in all areas. (Running time work: 60 days)
- Refurbished detached house 160 m2 in Peristeri (Year 2010)
(work: interior and construction of a patio, flooring installation laminate, new electrical installation, change interior door, frame and aluminum colors throughout)
- Renovation 140 m2 apartment in Agia Paraskevi (Year 2010)
(work: purges walls, new plumbing, new electrical installation, total reconstruction of a bathroom and wc, changing frames, sanding and polishing on wooden floors, polishing the floors of marble, installation of new internal doors, plasterboard to spot in a kitchen, bathroom and wc, supply and installation of new kitchen and wardrobes in bedrooms / d colors in all areas, a fireplace styles (Running time work: 90 days)
- Renovation apartment 60 m2 on the Avenue Katehaki (Year 2010)
- Renovation house 100 m2 in Kastela of Piraeus (Year 2009)
(work: home furnishings for creating 2 h / d, kitchen, living room, complete bathroom renovation, new plumbing and heating installation, connection to gas, new electrical installation, changing with new aluminum frames, terrazzo restoration, renovation of interior doors , construction of fireplaces, supply and installation of new kitchen and wardrobes in b / d in all colors of the interior, exterior insulation and exterior colors. (Running time work: 80 days)
- Renovation third floor apartment 90 m2 in Ano Glyfada (Year 2008)
(work: wall purges, consolidation kitchen - living room, creating a new wc, total renovation of bathroom, new plumbing, new electrical installation, changing with new aluminum frames, tiling throughout, installation of new internal doors, plasterboard to spot in a kitchen living room and bedroom / d, supply and installation of new kitchen and wardrobes in bedrooms / d colors in all areas. (Running time work: 70 days)
- Renovation third floor apartment 120 m2 on Gyzi (Year 2008)
- Renovation second floor apartment 90 m2 on Ag.Paraskeui (Year 2008)
- Renovation first floor apartment 120 m2 on Gyzi (Year 2009)
- Renovation apartment 125 m2 in Patissia - Athens (Year 2009)
- Renovation second floor apartment 120 m2 Petralona (Year 2009)
- Refurbished 3 storey flats and faces the cell in Kypseli (total area 182 m2) (Year 2009)
- Rebuild two storey residence at Egaleo (total area 200 m2) (Year 2008)
- Refurbished ground floor, floor and sides Kato Patissia (total area 188 m2) (Year 2009)
TENDER ENQUIRY FORM
Contact numbers: 2109737948 - 6944633417 - E-Mail: This email address is being protected from spambots. You need JavaScript enabled to view it.




